Copyright © 2015 | AD Perera & Sons

Our Project Back to Projects


Uma Oya Development Project, Sri Lanka

2011


33KV MV Panel & Distribution System, LV Distribution System, Local Area Network System & Structured Cabling System, Lightning Protection System, Fire Alarm System

Tunnel Boring Machine (TBM), Sophisticated tunnel boring machine, one of its kind installed for the first time in Sri Lanka to bore a 22km long tunnel. Power, lighting and ventilation were arranged in assisting of tunnel boring work.